首页 | 本学科首页   官方微博 | 高级检索  
     

断面安全约束下发电可行域实用分析方法
引用本文:周星宇,潘学萍,王正风,陈得治. 断面安全约束下发电可行域实用分析方法[J]. 中国电力, 2012, 53(12): 183-189. DOI: 10.11930/j.issn.1004-9649.202001060
作者姓名:周星宇  潘学萍  王正风  陈得治
作者单位:1. 河海大学 能源与电气学院,江苏 南京 211100;2. 国网安徽省电力有限公司,安徽 合肥 230061;3. 中国电力科学研究院有限公司,北京 100192
基金项目:国家自然科学基金资助项目(含主动负荷的综合负荷在线建模,51837004)
摘    要:针对市场环境下调度计划月度安全校核存在时间跨度大、负荷以及新能源出力预测精度差、交易电量的不确定程度高等问题,提出构建发电可行域的工程实用方法。首先,基于各发电机出力相对于关键断面的有功灵敏度,结合机组的地理位置,对全网机组进行分群;然后,提出构建发电可行域的基态潮流确定方法;在此基础上,以主导发电机群的总出力为横坐标,以系统总负荷为纵坐标,构建系统在不同负荷水平下的主导发电机群发电可行域;最后,根据系统运行方式对发电可行域进行在线修正。以某省级电网为例,验证所提方法的可行性。

关 键 词:调度计划  月度安全校核  关键断面  发电可行域  灵敏度  
收稿时间:2020-01-13

A Practical Method for Analyzing Feasible Generation Region under Security Constraint of Key Transmission Line Section
ZHOU Xingyu,PAN Xueping,WANG Zhengfeng,CHEN Dezhi. A Practical Method for Analyzing Feasible Generation Region under Security Constraint of Key Transmission Line Section[J]. Electric Power, 2012, 53(12): 183-189. DOI: 10.11930/j.issn.1004-9649.202001060
Authors:ZHOU Xingyu  PAN Xueping  WANG Zhengfeng  CHEN Dezhi
Affiliation:1. College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China;2. State Grid Anhui Electric Power Company, Hefei 230061, China;3. China Electric Power Research Institute, Beijing 100192, China
Abstract:Under power market circumstances, the monthly safety check of dispatch schedule faces many problems, such as long time span, poor forecast accuracy of power load and new energy power, and high uncertainty of trading energy. Therefore, a practical constructing method for feasible generation region is proposed in this paper. Firstly, the generator units in the whole grid are clustered based on the active power sensitivity of each generator unit relative to the key transmission line, and combined with the unit's geographic location. Secondly, the base power flow determination method for building feasible generation region is proposed. Furthermore, the feasible generation region of leading generator cluster under different load levels is built with the total active power output of leading cluster and the total load set as the horizontal coordinates and vertical coordinates, respectively. Finally, the feasible generation region is revised on-line according the power system’s real operation condition. A provincial power system is used to validate the feasibility of the proposed method in this paper.
Keywords:dispatch schedule  monthly security check  key transmission line section  feasible generation region  sensitivity  
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号