首页 | 本学科首页   官方微博 | 高级检索  
     


A sequencing problem for a mixed-model assembly line in a JIT production system
Authors:Zhao Xiaobo  Katsuhisa Ohno
Affiliation:

a Nagoya Institute of Technology, Nagoya 466, Japan

Abstract:In an assembly line of a just-in-time (JIT) production system, workers have the power and the responsibility to stop the line when they fail to complete their operations within their work zones. This paper deals with a sequencing problem for the mixed-model assembly conveyor line in the JIT production system. In some environment, the most important criterion is the line stoppage rather than the variation of production rates. The problem is to find an optimal sequence of units that minimizes the total line stoppage time. Lower and upper bounds of the total line stoppage time are derived and the branch-and-bound method is applied to the problem. A numerical example is given.
Keywords:JIT  minimizing line stoppage time  mixed-model assembly line  branch-and-bound method
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号