Project-oriented task scheduling for mobile robot team
Authors:Servet Hasgül  Inci Saricicek  Metin Ozkan  Osman Parlaktuna
Affiliation:(1) Department of Industrial Engineering, Eskisehir Osmangazi University, 26030 Eskisehir, Turkey;(2) Department of Electrical and Electronics Engineering, Eskisehir Osmangazi University, 26480 Eskisehir, Turkey
Abstract:This paper presents a project-oriented framework for multi-robot task scheduling. An agent-based architecture is designed to schedule tasks where robots are considered as resources. The study focused on the problems when the number of available robots is less than the required number. In this case, the problem becomes a resource-constrained scheduling problem. Initially, tasks are scheduled by using Critical path method (CPM), resource leveling method is used to smooth the deviation between the resource requirements and available resource levels, and tasks are allocated to robots. As robots perform their tasks, a monitoring agent observes them and tasks are rescheduled if the difference between the planned and actual completion time of tasks exceeds a predefined threshold. Effectiveness of the proposed approach is shown by using a nine-task two-robot project simulation.
Keywords:Agent-based system  Multi-robot task scheduling  Resource leveling  Project scheduling
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号