首页 | 本学科首页   官方微博 | 高级检索  
     

恒积大厦逆作法施工的结构设计
引用本文:丁伟达,邬伟民,祝涌年.恒积大厦逆作法施工的结构设计[J].建筑结构,1998(7).
作者姓名:丁伟达  邬伟民  祝涌年
作者单位:上海爱建建筑设计院 200030 (丁伟达,邬伟民),上海爱建建筑设计院 200030(祝涌年)
摘    要:高层建筑施工过程中通常会遇到深基坑的开挖和围护问题,尤其是有多层地下室时,其地下部分施工周期往往很长.作者主要介绍了恒积大厦逆作法施工期间的结构和支承体系设计和逆作法节点构造处理以及施工后的效果.供设计参考.

关 键 词:逆作法  支承桩  地下连续墙

Structural Design of Up-down Method in Hengji Tower's Construction
Ding Weida Wu Weimin Zhu Yongnian.Structural Design of Up-down Method in Hengji Tower''''s Construction[J].Building Structure,1998(7).
Authors:Ding Weida Wu Weimin Zhu Yongnian
Affiliation:Ding Weida Wu Weimin Zhu Yongnian
Abstract:The problem of deep pit digging and surround is usually met in high-rise building construction, especially in multi-story basement. The construction peroid of basement is very long. The author introduces the design of structure bearing system, the treatmenl of up-down method detail in period of Heng Ji Tower up-down construction and the result after construction, which give reference to structural designer.
Keywords:up-down method  bearing pile  diaphragm  structure design  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号