首页 | 本学科首页   官方微博 | 高级检索  
     

基于DGC工法的桥头病害处理
引用本文:朱子义,姚海龙,汪建鸽. 基于DGC工法的桥头病害处理[J]. 山西建筑, 2008, 34(11): 267-268
作者姓名:朱子义  姚海龙  汪建鸽
作者单位:1. 湖南省常德市公路管理局,湖南常德,410005
2. 长沙理工大学,湖南长沙,410076
摘    要:从台背回填的一般技术要求入手,分析了台背回填病害(即桥头跳车)产生的原因,并结合工程实例介绍了DGC工法处理桥头跳车的基本要领,成功解决了地基软弱和填土压实不足的难题。

关 键 词:台背回填  桥头跳车  DGC工法
文章编号:1009-6825(2008)11-0267-02
修稿时间:2007-12-20

Treatment of the diseases at bridge head based upon DGC construction method
ZHU Zi-yi,YAO Hai-long,WANG Jian-ge. Treatment of the diseases at bridge head based upon DGC construction method[J]. Shanxi Architecture, 2008, 34(11): 267-268
Authors:ZHU Zi-yi  YAO Hai-long  WANG Jian-ge
Affiliation:ZHU Zi-yi YAO Hai-long WANG Jian-ge
Abstract:Starting from the introduction of the technical specifications of back filling behind abutment the reasons caused the disease-vehicle jolting at bridgehead are analyzed.Combined with practical work basic requirements of DGC construction method in dealing with vehicle jolting at bridgehead are introduced,which successfully resolve the difficulties of soft soil foundation and less compactness.
Keywords:back filling behind abutment  vehicle jolting at bridge head  DGC construction method
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号