Resource Management in Construction
Authors:Fadi A Karaa  Anas Y Nasr
Affiliation:1Asst. Prof. of Civ. Engrg., Northeastern Univ., Boston, MA 02115
2Grad. Student, Dept. of Civ. Engrg., Northeastern Univ., Boston, MA 02115
Abstract:Resource plannirtg and management is one of the most important ingredients for competitiveness and profitability in today's construction industry. In order to control costs, equipment and labor should be utilized in the most efficient way possible. This can be achieved by minimizing the total cost of leased resources under the constraint of maximum and most efficient use of owned equipment and contracted labor force. This paper presents a mixed‐integer linear programming model for the management of resources throughout the project life. Based on the Critical Path Method time analysis, the model derives the schedule for equipment rentals and transient resources, as well as the utilization scheme for owned equipment and other available resources. The model can be used as an estimating tool for multi‐project resource planning and sharing, and as a means to implement the most efficient utilization of resources throughout the duration of the whole project.
Keywords:Construction management  Project management  Critical path method  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号