后浇带施工的处理方法
引用本文:韩国良. 后浇带施工的处理方法[J]. 包钢科技, 2007, 33(3): 44-46
作者姓名:韩国良
作者单位:包头第一热电厂,内蒙古,包头,014010
摘    要:文中主要介绍了建筑工程中有关现浇钢筋混凝土结构后浇带的定义、作用、分类、设计规范规定、施工中质量控制要点、施工内容、目前存在的问题和改进方法.

关 键 词:后浇带  沉降  收缩  建筑  施工
文章编号:1009-5438(2007)03-0044-03
修稿时间:2007-03-10

Processing Method of the Final Concreting Zone
HAN Guo-liang. Processing Method of the Final Concreting Zone[J]. Science & Technology of Baotou Steel(Group) Corporation, 2007, 33(3): 44-46
Authors:HAN Guo-liang
Affiliation:NO. 1 Thermal Power Plant of Baotou, Baotou 014010, Nei Monggol, China
Abstract:The thesis introduces the definition, the function, the classification, and the design rules of cast - in- place concrete construction for the final concreting zone in construction work. It indicates the key of quality control in the construction, the construction content,the present problem and the improving method.
Keywords:final concreting zone   subside    contract   build   construction