首页 | 本学科首页   官方微博 | 高级检索  
     

北仑电厂三期2×1000MW工程大体积混凝土施工
引用本文:徐磊.北仑电厂三期2×1000MW工程大体积混凝土施工[J].山西建筑,2007,33(27):59-160.
作者姓名:徐磊
作者单位:浙江省电力建设有限公司,浙江宁波315010
摘    要:结合工程概况,介绍了温度裂缝、收缩裂缝的产生机理,简述了裂缝控制措施,并从混凝土材料的选择及配合比设计、混凝土的浇筑等方面详细阐述了大体积混凝土的施工技术,为其他大体积混凝土的施工提供了参考。

关 键 词:大体积混凝土  施工技术  配合比设计
文章编号:1009-6825(2007)27-0159-02
修稿时间:2007-04-12

Massive concrete construction in the third phase of 2 × 1 000 MW engineering of Beilun power plant
XU Lei.Massive concrete construction in the third phase of 2 × 1 000 MW engineering of Beilun power plant[J].Shanxi Architecture,2007,33(27):59-160.
Authors:XU Lei
Abstract:Combined with practical engineering, the author introduces the mechanism of the generation of temperature crack and shrinkage crack, describes crack control measures, and illustrates massive concrete construction technologies from selection and mix design of concrete materials, and concrete laying, which to offer a reference for other massive concrete construction.
Keywords:massive concrete  construction technique  mix design
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号