基于三段洪水特征的调洪增发电量计算方法
引用本文:钟儒鸿,廖胜利,李树山,程春田,燕志宇. 基于三段洪水特征的调洪增发电量计算方法[J]. 电力自动化设备, 2021, 41(3): 204-210. DOI: 10.16081/j.epae.202101011
作者姓名:钟儒鸿  廖胜利  李树山  程春田  燕志宇
作者单位:大连理工大学 水电与水信息研究所,辽宁 大连 116024;大连理工大学 水电与水信息研究所,辽宁 大连 116024;中国南方电网电力调度控制中心,广东 广州 510523;大连理工大学 水电与水信息研究所,辽宁 大连 116024;大连理工大学 水电与水信息研究所,辽宁 大连 116024
基金项目:国家自然科学基金资助项目(51979023, U1765103);辽宁省自然科学基金资助项目(20180550354)
摘    要:充分应用水电站的调蓄特点可以合理利用洪水增加发电效益,但没有统一有效的洪水增发效益评价方法,为此,根据洪水涨落过程特点,提出一种基于三段洪水特征的调洪增发电量(PGIOFD)的概念与计算方法.根据水位及流量的涨落特征将场次洪水过程划分为涨水段、洪峰段和退水段3个阶段;分别按水位不变、按预想出力、按均匀降库容3种规则对三...

关 键 词:洪水资源利用  发电效益评价  调洪增发电量  洪水划分  调度规则

Calculation method of power generation increase on flood dispatching based on three-period flood characteristics
ZHONG Ruhong,LIAO Shengli,LI Shushan,CHENG Chuntian,YAN Zhiyu. Calculation method of power generation increase on flood dispatching based on three-period flood characteristics[J]. Electric Power Automation Equipment, 2021, 41(3): 204-210. DOI: 10.16081/j.epae.202101011
Authors:ZHONG Ruhong  LIAO Shengli  LI Shushan  CHENG Chuntian  YAN Zhiyu
Affiliation:Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China;Electric Power Dispatching and Control Center of China Southern Power Grid, Guangzhou 510523, China
Abstract:It can reasonably use flood to increase power generation benefit by fully applying the characteristics of reservoir regulation of hydropower station, but there is no uniform and effective assessment method for additional power generation benefit of flood, for which, according to the characteristics of flood ebbing and flowing process, the concept and calculation method of PGIOFD(Power Generation Increase On Flood Dispatching) are proposed based on three-period flood characteristics. According to the ebbing and flowing characteristic of water level and flow, a flood process is partitioned into three periods of water level rising period, flood peak period and water level falling period. The power generation of three periods are calculated according to three rules of constant water level, expected output and uniform storage capacity reduction, and the benchmark process and power generation without optimization measures are determined. The power generation is compared with practical dispatching power generation to get the PGIOFD. Taking 29 floods of Dahuashui power station in Wujiang River from 2008 to 2018 as examples, and results show that resou-rces of 26 floods are fully used with the cumulative PGIOFD of 128.38 GW·h, which verifies that the proposed method can be effectively applied to flood process analysis and flood dispatching evaluation.
Keywords:flood resource utilization   power generation benefit assessment   power generation increase on flood dispatching   flood partition   dispatching rule