首页 | 本学科首页   官方微博 | 高级检索  
     


Photovoltaic power plant experience at Arizona Public Service: a 5‐year assessment
Authors:L Moore  H Post  H Hayden  S Canada  D Narang
Abstract:Arizona Public Service (APS) currently has over 4·9 MWdc of grid‐connected photovoltaic systems that have been installed in its service territory over the past five years. Most of this installed PV capacity is in support of the Arizona Corporation Commission Environmental Portfolio Standard goal that encourages APS to generate 1·1% of its energy generation through renewable resources by 2007, with 60% of that amount from solar. During this time, much has been learned regarding performance, cost, maintenance, installation and design. This paper presents an assessment of these topics and a perspective associated with this PV experience. Published in 2005 by John Wiley & Sons, Ltd.
Keywords:large grid‐connected PV systems  utility PV  field performance  cost  operation and maintenance experience
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号