首页 | 本学科首页   官方微博 | 高级检索  
     

浅谈坑口电厂优化设计的几点体会
引用本文:许红. 浅谈坑口电厂优化设计的几点体会[J]. 煤炭加工与综合利用, 2006, 0(6): 24-27
作者姓名:许红
作者单位:中煤国际工程集团,北京华宇工程有限公司,北京,100011
摘    要:从资源优化配置,树立全局观念,因地制宜采用新设备、新工艺、新布置,按照规程确定设计方案等方面论述了如何优化设计坑口电厂;通过现场实例,比较了不同煤泥管道输送系统的特点;强调了要树立“务实、创新、高效”的设计理念;指出在设计过程中,工艺、控制、土建等专业要密切配合。

关 键 词:坑口电厂  优化设计  工艺  输送系统
文章编号:1005-8397(2006)06-0024-04
收稿时间:2006-07-17
修稿时间:2006-07-17

Preliminary discussion on the optimal design of a pit - mouth power plant in Chinese coal mines
XU Hong. Preliminary discussion on the optimal design of a pit - mouth power plant in Chinese coal mines[J]. Coal Processing & Comprehensive Utilization, 2006, 0(6): 24-27
Authors:XU Hong
Abstract:Discussed is how a pit-mouth power plant is optimally designed in such regard as optimal disposition of resources,adopting an overall point of view,employing new equipment,process and plan arrangement matched with local condition and design option determined according to regulations;with a concrete example,compared are special feature of different pipeline system for slime water;emphasized is the design concept of "practicability,innovation,high-efficiency";pointed out is the close coordination between technical process,control and civil engineering in the course of design.
Keywords:coal mine  pit-mouth power plant  optimal design  technical process  transportation system
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号