首页 | 本学科首页   官方微博 | 高级检索  
     

1.2Mt/a延迟焦化装置油气线结焦现象分析
引用本文:徐先财,魏文,张灵.1.2Mt/a延迟焦化装置油气线结焦现象分析[J].炼油与化工,2016(2):24-26.
作者姓名:徐先财  魏文  张灵
作者单位:乌鲁木齐石化公司炼油厂,新疆乌鲁木齐,830019
摘    要:乌鲁木齐石化公司1.2 Mt/a延迟焦化装置连续运行2 a后,由于焦炭塔大油气线结焦严重,导致焦炭塔压力升高,影响到装置正常生产。通过对该装置大油气线结焦现象分析,结合装置现状和运行过程中存在的问题,提出相应的优化措施,收到良好的效果。

关 键 词:延迟焦化装置  油气线  结焦  急冷油

Analysis of coking phenomenon in oil & gas pipelines of 1.2 Mt/a delayed coker
Abstract:After continuous operation of 2 years of the 1.2 Mt/a delayed coker in Urumchi Petrochemical Company,the coking in large oil & gas pipelines of coke tower was severe,which caused the coke tower pressure risen and influenced normal operation of the unit. By analyzing the coking phenomenon in the large oil&gas pipelines,combining the status quo of the coker and the problems existed in operation,the relevant optimization measures was put forward,good result was obtained.
Keywords:delayed coker  oil&gas pipelines  coking  quenching oil
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号