二期上游围堰防渗墙的施工技术
引用本文:蒋振中.二期上游围堰防渗墙的施工技术[J].中国三峡建设,1999,6(7):20-23.
作者姓名:蒋振中
作者单位:中国水利水电基础工程局!天津,610213
摘    要:三峡二期上围堰防渗墙是围堰工程成败的关键,在施工中大量采用了先进的大型设备,如BC-30液压铣槽机,机械式抓斗,冲击式反循环钻机,高压旋喷泵等。同时大量采用了新工艺,新材料,新技术,如用“铣爆”法,“铣抓钻结合”法成槽;用“双反弧接头槽”法,“铣削”法连接;用于灌浓浆法处理漏失地层;用反循环泵吸法清孔换浆等,既满足了防渗墙高施工要求,又确保了工程质量,为我国防渗墙施工开创了新局面。

关 键 词:设备  材料  新技术  防渗墙  施工技术  围堰

Construction Technology of Cut-off Wall in Cofferdam
Jiang Zhenzhong.Construction Technology of Cut-off Wall in Cofferdam[J].China Three Gorges Construction,1999,6(7):20-23.
Authors:Jiang Zhenzhong
Affiliation:Jiang Zhenzhong
Abstract:The construction of the cut - off wall in the second - phase upstream cofferdam at the Three Gorges Project is the key item for the cofferdam works. A number of advanced construction equipment was employed, such as BC - 30 hydraulic trench cutter, automatlc crab, re - circular impulsive drill, hlgh - pressure rotary jet pump, etc. Meanwhile, many new techniques were applied,e. g., trenching processes and cutting, chlseling and blasting, and by cutting, crabbing and drilling; overlapping by double-counter-arc joint trench, and by cutting; pre - grouting thick mix into leaking strata; and cleaning of holes and changing of new mortar with re - circular pump. The new equipment and techniques not only met the construction requirements, and also ensured the construction quality of the cut - off wall, and initiate a new prospect for construction of cu -off wall in China.
Keywords:Advanced equipment New processing New material New technique