首页 | 本学科首页   官方微博 | 高级检索  
     

井漏失返条件下的吊灌作业安全时间计算方法
引用本文:刘绘新,樊东昌,刘璞. 井漏失返条件下的吊灌作业安全时间计算方法[J]. 天然气工业, 2016, 36(7): 63-67. DOI: 10.3787/j.issn.1000-0976.2016.07.009
作者姓名:刘绘新  樊东昌  刘璞
作者单位:西南石油大学石油与天然气工程学院
摘    要:"吊灌"作业是在井漏失返条件下保持井内压力动态平衡、获得安全作业时间的重要措施。但在实施吊灌作业时,由于反映井筒内环空液面变化规律的动态数模分析方法缺失,不能为工程实践提供吊灌的合理依据,使其基本处于"盲吊"状态。为此,笔者根据"吊灌"技术实际工况,首次采用井筒漏失动态分析方法,建立起吊灌安全作业时间数学模型,给出了多种漏失速率的积分结果,并结合现场实例对计算结果进行了验证。结果表明:(1)利用计算实例对数学模型的可靠性进行检验,计算结果与实际数据高度吻合;(2)适当增加吊灌量可以增加安全作业时间;(3)适当减少吊灌钻井液密度也可以增加安全作业时间。结论认为:该成果可以从根本上解决"吊灌"技术的安全作业时间准确计算问题,对于规避井漏失返条件下的井控安全风险、实现"吊灌"技术优化、降低工程费用等都具有重要意义。


Calculation of safe time in "Hang's Mudding-off" technique of circulation loss in return
Liu Huixin,Fan Dongchang,Liu Pu. Calculation of safe time in "Hang's Mudding-off" technique of circulation loss in return[J]. Natural Gas Industry, 2016, 36(7): 63-67. DOI: 10.3787/j.issn.1000-0976.2016.07.009
Authors:Liu Huixin  Fan Dongchang  Liu Pu
Affiliation:College of Petroleum Engineering, Southwest Petroleum University, Chengdu, Sichuan 610500, China
Abstract:The so-called "Hang's Mudding-off" technique is critical to keeping the dynamic pressure balance and guaranteeing the sufficientsafe operation time in wellbore. However, for lack of dynamic mathematical model analysis methods for reflecting the changes of annulus liquid level in the borehole during the "Hang's Mudding-off" operation, the actual operation is basically conducted blindly withoutreasonable engineering basis. According to the actual conditions, a mathematical model for the safe time of the "Hang's Mudding-off" was, for the first time, built up by using the dynamic borehole leakage analysis method. Then, the integral results of leak-off rates were calculated. Finally, the calculation results were verified by field cases. It is shown that the calculation results are highly accordant with the actual data, indicating the reliability of the mathematical model. The safe operation time can be increased by increasing mud amount or reducing mud density appropriately. With this model, the safe time of "Hang's Mudding-off" operation can be calculated accurately. This research result is of great significance to avoiding well control risk of absorption wells, optimizing the "Hang's Mudding-off" techniqueand reducing project cost.
Keywords:Pressure control,Circulation loss in return,"  Hang's Mudding-off",technique,Liquid level monitoring,Mathematical model  
Dynamic pressure balance,Safe time,Leak-off rate,
本文献已被 CNKI 等数据库收录!
点击此处可从《天然气工业》浏览原始摘要信息
点击此处可从《天然气工业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号