既有线顶进涵架设便梁
引用本文:温平.既有线顶进涵架设便梁[J].山西建筑,2010,36(34):339-340.
作者姓名:温平
作者单位:中铁十二局集团一公司,山西临汾041000
摘    要:以某既有线顶进框架涵架设便梁为工程背景,简单介绍了顶进涵架设便梁前的准备工作,详细阐述了架设施工流程及技术要点,并总结出施工注意事项,为类似工程便梁的架设积累了经验。

关 键 词:既有线  顶进涵  军用梁  架设

On erection of temporary beam of jacking culvert of existing line
WEN Ping.On erection of temporary beam of jacking culvert of existing line[J].Shanxi Architecture,2010,36(34):339-340.
Authors:WEN Ping
Abstract:Taking the erection of temporary beam of the jacking culvert of existing line as the engineering background, the paper introduces the preparation for the erection of the temporary beam of the jacking culvert, illustrates the erection construction process and the technical points, and sums up some precautions for the construction, and accumulate the experience for the erection of the similar engineering temporary beam.
Keywords:existing line  jacking culvert  military beam  erection