首页 | 本学科首页   官方微博 | 高级检索  
     

采煤机调高泵箱液压元件布局改进设计
引用本文:宋锋涛,王小斌,雷丙涛.采煤机调高泵箱液压元件布局改进设计[J].煤矿机械,2011(9):164-165.
作者姓名:宋锋涛  王小斌  雷丙涛
作者单位:安徽山河矿业装备股份有限公司;
摘    要:采煤机调高泵箱顶部空间狭小,却需要布置液压系统的所有元件。根据现场实际情况分析了某公司MG550/1230-WD采煤机调高泵箱顶板上液压元件布局存在的问题,并提出了液压元件改造的具体方案,设计了新的结构及布局,现场改进后效果明显。

关 键 词:调高泵箱  组件  软管  拆卸

Design on Hydraulic Increase System of Shearer
SONG Feng-tao,WANG Xiao-bin,LEI Bing-tao.Design on Hydraulic Increase System of Shearer[J].Coal Mine Machinery,2011(9):164-165.
Authors:SONG Feng-tao  WANG Xiao-bin  LEI Bing-tao
Affiliation:SONG Feng-tao,WANG Xiao-bin,LEI Bing-tao (Anhui Shanhe Mining Equipment Co.,Ltd.,Xi'an 710075,China)
Abstract:The place on top of hydraulic increase station of shearer is very narrow,but it needs to lay all hydraulic system components.According with actual conditions,problems of layout of MG550/1230-WD shearer are analysed and some reforming scheme and designs new layout are put.It has obvious effect after mounting on spot.
Keywords:hydraulic increase station  module  hydraulic hose  dismount  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号