龙胜县仙洞水电站隧洞复杂地质段施工
引用本文:唐强.龙胜县仙洞水电站隧洞复杂地质段施工[J].广西水利水电,2011(1):63-64,75.
作者姓名:唐强
作者单位:广西桂林市天力水利电力建筑安装工程公司,广西桂林,541001
摘    要:分析了龙胜县仙洞水电站工程引水隧洞的工程地质情况,论述了以普氏理论与新奥法相结合指导隧洞开挖施工,采用"短开挖、弱爆破、木支撑、钢筋混凝土衬砌"的方法及施工质量控制工艺.

关 键 词:引水隧洞  工程地质  施工

Construction of tunnel under complex geological condition for Xiandong Hydropower Station
TANG Qiang.Construction of tunnel under complex geological condition for Xiandong Hydropower Station[J].Gx Water Resources & Hydropower Engineering,2011(1):63-64,75.
Authors:TANG Qiang
Affiliation:TANG Qiang(Guilin Tianli Water and Power Construction & Installation Engineering Corporation,Guilin 541001,China)
Abstract:Based on analysis of the engineering geological conditions of the diversion tunnel of Xiandong Hydropower Station located at Longsheng County of Guangxi,the author discussed how M.M.Promojiyfakonov theory was combined with the New Austrian Tunneling Method(NATM) to instruct tunnel excavation,and introduced the construction quality control technique and construction methods such as shorter advancing section,weak blasting,timbering and reinforced concrete lining.
Keywords:Diversion tunnel  engineering geology  construction