首页 | 本学科首页   官方微博 | 高级检索  
     

新疆某水电站引水发电洞施工支洞堵头设计
引用本文:王永涛,张万军.新疆某水电站引水发电洞施工支洞堵头设计[J].广西水利水电,2011(1):25-28.
作者姓名:王永涛  张万军
作者单位:新疆水利水电勘测设计研究院,新疆乌鲁木齐,830000
摘    要:结合新疆某水电站工程引水发电洞施工支洞实际情况,介绍了堵头长度的确定和抗滑稳定安全系数的复核,并对堵头的结构及封堵施工进行了系统设计。

关 键 词:施工支洞  堵头  设计  施工

Construction adit bulkhead design for power diversion tunnel of one hydropower station in Xinjiang
WANG Yong-tao,ZHANG Wan-jun.Construction adit bulkhead design for power diversion tunnel of one hydropower station in Xinjiang[J].Gx Water Resources & Hydropower Engineering,2011(1):25-28.
Authors:WANG Yong-tao  ZHANG Wan-jun
Affiliation:(Xinjiang Water and Hydropower Investigation,Design and Research Institute,Urumchi 830000,China)
Abstract:Combined with the actual conditions of the construction adit of power diversion tunnel of one hydropower station located in Xinjiang Uigur Autonomous Region,an introduction was made on the determination of bulkhead length,the check of the coefficient of sliding resistance,the systematic design of bulkhead structure and closing construction.
Keywords:Construction adit  bulkhead  design  construction
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号