工程量清单计价模式下的动态调整分析
引用本文:李祥瑞. 工程量清单计价模式下的动态调整分析[J]. 山西建筑, 2008, 34(35)
作者姓名:李祥瑞
作者单位:忻州供电分公司,山西忻州,034000
摘    要:探讨了工程量清单计价方法存在的缺点和不足,分析了工程量清单计价合同结算价款动态调整办法,指出应按照责权利平衡原则科学界定当事人的权利和义务,在合同条款中约定工程价款的调整办法,从而保证工程建设顺利进行.

关 键 词:工程量清单  计价模式  动态调整  合同

Dynamic adjust analysis under engineering bill pricing mode
LI Xiang-rui. Dynamic adjust analysis under engineering bill pricing mode[J]. Shanxi Architecture, 2008, 34(35)
Authors:LI Xiang-rui
Affiliation:LI Xiang-rui
Abstract:Based upon discussion of the shortages of engineering bill pricing method dynamic adjust analysis method of setting account of engineering cost under engineering bill pricing mode is analyzed.Author points out that the balance principle among duty,right and interest should be followed to make clear the rights and duties of party,specify the adjust method in terms of contract to ensure the smooth running of projects.
Keywords:engineering bill  pricing mode  dynamic adjust  contract