首页 | 本学科首页   官方微博 | 高级检索  
     

卫星吊装过程的板间错动数值计算研究
引用本文:郑晓亚,张铎,姜晋庆.卫星吊装过程的板间错动数值计算研究[J].西北工业大学学报,2004,22(5):596-599.
作者姓名:郑晓亚  张铎  姜晋庆
作者单位:西北工业大学,航天学院,陕西,西安,710072
摘    要:卫星结构在吊装过程中极易受到冲击载荷的作用,产生板间错动,从而留下永久变形,影响其装配精度。采用基于预紧力、摩擦力和外载荷同时作用下的接触计算原理,有效地解决了板间连接刚度和临界错动载荷的计算问题,采用蜂窝夹层等效板原理成功组建了卫星结构的计算模型。通过一个实际卫星板问错动算例,说明了所采用原理和方法的正确性。

关 键 词:永久变形  预紧力  摩擦力  等效板  接触
文章编号:1000-2758(2004)05-0596-04
修稿时间:2004年2月17日

On Calculating Glide between Plates of Satellite Structure during Uplift
Zheng Xiaoya,Zhang Duo,Jiang Jinqing.On Calculating Glide between Plates of Satellite Structure during Uplift[J].Journal of Northwestern Polytechnical University,2004,22(5):596-599.
Authors:Zheng Xiaoya  Zhang Duo  Jiang Jinqing
Abstract:Impulsive load during uplift of satellite structure can easily produce glide between plates, causing permanent distortion and affecting adversely assembly precision. In one actual case, glide made required assembly precision unattainable and caused malfunction of high-precision optical instruments. In China, there exist published papers~(3,4]) that are quite effective for calculating glide but we aim to go beyond them. Like references 3 and 4, our calculation is based on contact calculation theory but unlike them, in our calculation, we take into consideration simultaneously the effect of the friction force, the prestressing force and the external loads. In uplifting satellite structure, the case in which the uplifted structure is inclined is more critical than the case in which the structure is level. Our calculation method gives the critical gliding load and the magnitude of glide when the critical gliding load is exceeded. Our method was used on a numerical example and gave computed amounts of glide. The calculated results remain to be checked against results of experimental research that is being planned.
Keywords:permanent distortion  friction force  prestressing force  contact
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号