首页 | 本学科首页   官方微博 | 高级检索  
     

A new technique of combining accretion by cyclone separator and scattertube for tailings dams
作者姓名:柳厚祥  李宁  廖雪  龚锦林  方风华
作者单位:[1]InstituteofGeotechnicalEngineering,ChangshaUniversityofScienceandTechnology,Changsha410076,China [2]InstituteofGeotechnicalEngineering,Xi'anUniversityofTechnology,Xi'an710048,China [3]CommunicationsDepartmentofHunanProvince,Changsha410011,China
摘    要:A new technique of combining accretion by cyclone separator and scattertube for tailings dams was devel-oped according to laboratory experiment, model experiment and spot experiment technology. Three tailings dams were successfully constructed by the new technique. The results of engineering geological exploration, static and dy-namic test and stability analysis on Baizhishan tailings dams prove that the new technique improves structure and sta-bility of the dams and working conditions compared with the traditional technique. The thin layers of fine-grained soils are greatly reduced, fine tailings sand is solid to make the dam stable and seepage conditions are well improved,the immersing line of the dam descends. In addition, the stability and liquefaction resistance of tailings dams are strengthened remarkably. The interior stress is compressive stress, stress level of every element is less than 1.0 and safety coefficient of every element is greater than 1.0. The safety coefficient against liquefaction of every element of tailings dams is greater than 1.5 according to the analysis of seismic response by finite element method.

关 键 词:土动力学  地基  土质  综合增长  旋风分离器
收稿时间:20 August 2003
修稿时间:29 October 2003

A new technique of combining accretion by cyclone separator and scattertube for tailings dams
Liu Hou-xiang , Li Ning , Liao Xue , Gong Jin-lin and Fang Feng-hua.A new technique of combining accretion by cyclone separator and scattertube for tailings dams[J].Journal of Central South University of Technology,2004,11(2):185-191.
Authors:Liu Hou-xiang  Li Ning  Liao Xue  Gong Jin-lin and Fang Feng-hua
Affiliation:(1) Institute of Geotechnical Engineering, Changsha University of Science and Technology, 410076 Changsha, China;(2) Institute of Geotechnical Engineering, Xi’an University of Technology, 710048 Xi’an, China;(3) Communications Department of Hunan Province, 410011 Changsha, China
Abstract:A new technique of combining accretion by cyclone separator and scattertube for tailings dams was developed according to laboratory experiment, model experiment and spot experiment technology. Three tailings dams were successfully constructed by the new technique. The results of engineering geological exploration, static and dynamic test and stability analysis on Baizhishan tailings dams prove that the new technique improves structure and stability of the dams and working conditions compared with the traditional technique. The thin layers of fine-grained soils are greatly reduced, fine tailings sand is solid to make the dam stable and seepage conditions are well improved; the immersing line of the dam descends. In addition, the stability and liquefaction resistance of tailings dams are strengthened remarkably. The interior stress is compressive stress, stress level of every element is less than 1.0 and safety coefficient of every element is greater than 1.0. The safety coefficient against liquefaction of every element of tailings dams is greater than 1.5 according to the analysis of seismic response by finite element method.
Keywords:tailings dams  combining accretion  cyclone separator  scattertube  upstream raising method
本文献已被 CNKI 维普 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号