阳明山水电站混凝土砌石双曲拱坝优化设计
引用本文:郑绍敦. 阳明山水电站混凝土砌石双曲拱坝优化设计[J]. 水电站设计, 2007, 23(4): 4-7
作者姓名:郑绍敦
作者单位:桂林市水利电力勘测设计研究院,广西,桂林,541001
摘    要:阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。整个坝体不分缝,施工进度快,降低工程造价。本文对此拱坝的设计进行了介绍。

关 键 词:砌石拱坝  双曲拱坝  泄洪  无缝设计  最优设计  阳明山水电站
文章编号:1003-9805(2007)04-0004-04
修稿时间:2007-06-22

Yangmingshan Hydropower Station Concrete Stone Masonry Double Curvature Arch Dam Optimization Design
ZHENG Shao-dun. Yangmingshan Hydropower Station Concrete Stone Masonry Double Curvature Arch Dam Optimization Design[J]. Design of Hydroelectric Power Station, 2007, 23(4): 4-7
Authors:ZHENG Shao-dun
Abstract:Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.The whole dam is not divided into blocks by joints.The construction proceeded fast and the cost was lowered.This pape give a presentation of the arch dam design.
Keywords:masonry arch dam  double curvature arch dam  flood discharging  jontless design  optimum design  Yangmingsha Hydropower station