马马崖一级水电站折线坝坝顶变形监测设计
引用本文:邓荣欢,龚刚.马马崖一级水电站折线坝坝顶变形监测设计[J].广西水利水电,2014(6):89-91.
作者姓名:邓荣欢  龚刚
作者单位:中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳,550081
摘    要:马马崖一级水电站工程大坝呈折线布置,坝顶变形监测设备布置受到很大限制。为此,对表面观测墩的结构形式和布置方式进行了改进,并通过静力水准系统解决折线坝上真空激光准直系统校测问题,合理解决了折线坝坝顶变形监测难题,其经验可供类似工程参考。

关 键 词:折线坝  变形监测  坝顶  马马崖一级水电站工程

Crest deformation monitoring design for zigzag-axis main dam of Mamaya Cascade-I Hydropower Project
DENG Rong-huan,GONG Gang.Crest deformation monitoring design for zigzag-axis main dam of Mamaya Cascade-I Hydropower Project[J].Gx Water Resources & Hydropower Engineering,2014(6):89-91.
Authors:DENG Rong-huan  GONG Gang
Affiliation:(Guiyang Engineering Corporation Limited of Power China, Guiyang 550081, China)
Abstract:The main dam of Mamaya Cascade-I Hydropower Project is designed with zigzag axis,rendering much limitations for arrangement of crest deformation monitoring equipment. Therefore,the structure and arrangement of surface monitoring piers were improved; hydrostatic leveling system was adopted for calibration of vacuum laser alignment system,which properly solved the crest deformation monitoring problem for zigzag-axis dam and may be reference for similar projects.
Keywords:Zigzag-axis dam  deformation monitoring  dam crest  Mamaya Cascade-I Hydropower Project