首页 | 本学科首页   官方微博 | 高级检索  
     

承德市典型责任主体灭失矿山迹地地质环境治理方案与对策
引用本文:袁运许,朱小龙,刘硕,宋建伟,李小光,夏冬. 承德市典型责任主体灭失矿山迹地地质环境治理方案与对策[J]. 有色金属(矿山部分), 2022, 74(6)
作者姓名:袁运许  朱小龙  刘硕  宋建伟  李小光  夏冬
作者单位:河北省地质环境监测院,河北省地质资源环境监测与保护重点实验室;河北省地质环境监测院,河北省地质资源环境监测与保护重点实验室;河北省地质环境监测院,河北省地质资源环境监测与保护重点实验室;河北省地质环境监测院,河北省地质资源环境监测与保护重点实验室;华北理工大学矿业工程学院,华北理工大学
基金项目:河北省科技支撑计划项目(20534201D);河北省重点基础研究计划项目(19224204D)。
摘    要:承德市是河北省矿业大市,由于历史上的无序开采或盗采,形成了数量较多的以铁矿、石灰岩矿、白云岩矿为主的责任主体灭失矿山迹地,严重破坏了矿区及其周边的生态环境,阻碍了美丽河北的实现进程。基于此,本文在对承德市8县3区59个典型责任主体灭失矿山迹地地质环境调查分析的基础上,根据各县区责任主体灭失矿山迹地类型、破坏规模、气候特点等影响因素,在每一县区选一有代表性的矿山迹地进行矿山地质环境治理方案设计,为县区内其他迹地地质环境治理方案设计提供参考。为深入贯彻习近平总书记生态文明思想,牢固树立绿水青山就是金山银山的理念,依据承德市责任主体灭失矿山迹地综合治理方案,提出强化责任、加强组织领导,科学引导、强化顶层设计,持续推进、抓好专项治理和综合施策、破解治理难题等责任主体灭失矿山迹地地质环境治理对策。

关 键 词:主体责任灭失  矿山迹地 矿山地质环境  治理方案 对策  承德市
收稿时间:2022-09-10
修稿时间:2022-09-25

Treatment scheme and Countermeasures of geological environment of mine sites lost by typical responsible subjects in various counties and districts of Chengde City
xiadong. Treatment scheme and Countermeasures of geological environment of mine sites lost by typical responsible subjects in various counties and districts of Chengde City[J]. , 2022, 74(6)
Authors:xiadong
Affiliation:The Institute of Geo-Environment Monitoring of Hebei Province,,,,,
Abstract:Chengde City is a major mining city in Hebei Province, due to historically disorderly mining or illegal mining, a large number of mine sites that have lost the main body of responsibility, dominated by iron ore, limestone ore, and dolomite ore, have formed, the surrounding ecological environment hinders the realization of beautiful Hebei. Based on the survey and analysis of the geological environment of 59 typical mines that have lost the main body of responsibility in 8 counties and 3 districts in Chengde City, according to the influencing factors such as the type, scale of damage and climatic characteristics of the lost mine site by the responsible main body in each county, a representative mine site in each county is selected for the design of the mine geological environment management plan, and the geological environment management of other sites in the county the scheme design provides reference. In order to thoroughly implement the ecological civilization thought of General Secretary Xi Jinping, and firmly establish the concept that green water and green mountains are golden mountains and silver mountains, according to the comprehensive management plan for the destruction of mine sites by the responsible main body in Chengde City, we propose to strengthen responsibilities, strengthen organizational leadership, scientific guidance, and strengthen top-level design, and continue Promote and do a good job in special governance and comprehensive implementation of policies, and solve governance problems and other responsible entities to eliminate the geological environment governance countermeasures of the mine traces.
Keywords:Loss of subject liability   Mine site   Mine geological environment   Governance scheme   Countermeasure   Chengde City
点击此处可从《有色金属(矿山部分)》浏览原始摘要信息
点击此处可从《有色金属(矿山部分)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号