首页 | 本学科首页   官方微博 | 高级检索  
     


Two branch-and-bound algorithms for the robust parallel machine scheduling problem
Authors:Mohammad Ranjbar  Morteza Davari
Affiliation:a Department of Industrial Engineering, Faculty of Engineering, Ferdowsi University of Mashhad, Mashhad, Iran
b Research group ORSTAT, Faculty of Business and Economics, KULeuven, Belgium
Abstract:Uncertainty is an inevitable element in many practical production planning and scheduling environments. When a due date is predetermined for performing a set of jobs for a customer, production managers are often concerned with establishing a schedule with the highest possible confidence of meeting the due date. In this paper, we study the problem of scheduling a given number of jobs on a specified number of identical parallel machines when the processing time of each job is stochastic. Our goal is to find a robust schedule that maximizes the customer service level, which is the probability of the makespan not exceeding the due date. We develop two branch-and-bound algorithms for finding an optimal solution; the two algorithms differ mainly in their branching scheme. We generate a set of benchmark instances and compare the performance of the algorithms based on this dataset.
Keywords:Robust scheduling  Identical parallel machines  Stochastic processing times
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号