首页 | 本学科首页   官方微博 | 高级检索  
     

万家寨引黄工程总干线三级泵站弦式应变计预埋故障分析
引用本文:田润暹,李创林. 万家寨引黄工程总干线三级泵站弦式应变计预埋故障分析[J]. 山西水利科技, 2002, 0(3): 68-69,74
作者姓名:田润暹  李创林
作者单位:水利部山西水利水电勘测设计研究院
摘    要:观测仪器预埋在混凝土后,其事故发生的概率尽管很小,但其发生将无法使安全监测等工作顺利进行,本文分析总干线三级泵站弦式应变计施工后无法读测的原因,供以后解决类似问题参考。

关 键 词:万家寨引黄工程 泵站 弦式应变计 预埋 故障分析
文章编号:1006-8139(2002)03-68-02

Analysis of Embeded String Strain Meter''s Breakdown
Li Chuanglin. Analysis of Embeded String Strain Meter''s Breakdown[J]. Shanxi Hydrotechnics, 2002, 0(3): 68-69,74
Authors:Li Chuanglin
Affiliation:Li Chuanglin
Abstract:In horizontal outlet tunnel,Pompin g station No.3,the general main line,Wanjiazhai YRDP(Yellow River Diversion Project),four of the string strain meters had b een embeded on July 30,2000.Howecver,since November 27,2000,the breakdown had been discovered one after another,t he strings' frequency of vibration readings had not been able to be taken.In this p aper the cause of the breakdown is analyzed.The writers hold that the pos-sibility that the temperature cause d the breakdown of the string strain meters can not be ruled out.
Keywords:String Strain Meter Breakdown Analy sis
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号