首页 | 本学科首页   官方微博 | 高级检索  
     


Practical crack control during the construction of precast segmental box girder bridges
Authors:Do-Young Moon   Jongsung Sim  Hongseob Oh  
Affiliation:aDepartment of Civil and Environmental Engineering, Hanyang University, 1271 Sa1-dong, Ansan 425-791, South Korea;bDepartment of Civil Engineering, Jinju National University, 150 Chilam-dong, Jinju, Kyeongnam 660-758, South Korea
Abstract:Cracks that occurred in the bottom slab of a precast segmental bridge were investigated through a construction sequence analysis, which revealed that the cracks were caused by excessive deformation during temporary post-tensioning while joining the segments. In addition, a parametric study was performed to evaluate the effects of the prestressing sequence, bottom slab thickness, and position of the prestressing anchors. The structural behavior of the girder sections was greatly affected by the thickness of the bottom slab and the position of prestressing anchors, but not by the prestressing sequence. Based on the results, a construction method that prevents the cracks is proposed.
Keywords:Construction sequence analysis   FE analysis   PC box girder   Precast segmental bridge   Structural behavior   Temporary prestressing
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号