首页 | 本学科首页   官方微博 | 高级检索  
     

AGC机组参与电力市场辅助服务的探讨
引用本文:葛炬,张粒子,周小兵,董雷. AGC机组参与电力市场辅助服务的探讨[J]. 电网技术, 2002, 26(12): 61-65
作者姓名:葛炬  张粒子  周小兵  董雷
作者单位:1. 华北电力大学,北京,102206
2. 国家电力公司华中公司,湖北省,武汉市,430077
摘    要:电力系统频率调整是保证电力系统安全稳定运行的重要任务,也是电力市场中辅助服务的重要部分之一。AGC机组是调频服务的主要提供者,为解决AGC机组参与电力市场辅助服务面临的诸多问题,制定合理的调频市场规则,形成有序竞争的调频市场并保障电力市场环境下系统频率调整的正常进行,作者提出了以下相关问题并进行了探讨:(1)分析AGC机组在电力市场中所面临的调度和交易问题;(2)在分析AGC机组的运行成本的基础上,探讨了对AGC机组的服务进行合理经济补偿的办法以及对AGC机组所提供的辅助服务的质和量进行评估等问题;(3)分别提出在无辅助服务市场的机制下,公平、合理地调度AGC机组的原则和在有辅助服务市场机制下的几种AGC机组竞争模式;(4)为调频服务市场的建立和实施,提出了一些可行性建议。

关 键 词:AGC 机组 电力市场 辅助服务 电网调度自动化
文章编号:1000-3673(2002)12-0061-05
修稿时间:2002-06-05

DISCUSSION ON AGC UNITS PARTICIPATING ANCILLARY SERVICES IN ELECTRICITY MARKET
GE Ju,ZHANG Li-zi,ZHOU Xiao-bing,DONG Lei. DISCUSSION ON AGC UNITS PARTICIPATING ANCILLARY SERVICES IN ELECTRICITY MARKET[J]. Power System Technology, 2002, 26(12): 61-65
Authors:GE Ju  ZHANG Li-zi  ZHOU Xiao-bing  DONG Lei
Affiliation:GE Ju1,ZHANG Li-zi1,ZHOU Xiao-bing2,DONG Lei1
Abstract:Load frequency control is an important taskensuring the security and stability of power system and is oneof main ancillary services in electricity market. AGC units are the main suppliers for load frequency control. In order to solve the problems of the AGC units participating ancillary services in the power market, lay down the reasonable rules, formordered competitive load frequency control market and ensure the normal proceeding of load frequency control in electricity market. The following problems are put forward and discussed. The first is the analysis of the dispatching and transactionswhich the AGC units will face in electricity market. Thesecond is the reasonable economic compensation means and the evaluation means for ancillary services quality andquantity based on the analysis of the wheeling costs of AGC units. The third is the principle of impartial and reasonablescheduling of AGC units under the mechanism withoutancillary service market and several competitive bidding modes of AGC units under the ancillary services market. The fourth is some feasible suggestions for establishing and implementing ancillary services market of load frequency control.
Keywords:electricity market  ancillary services  AGC
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号