首页 | 本学科首页   官方微博 | 高级检索  
     

小寨特大桥主梁施工监控技术要求
引用本文:王光金. 小寨特大桥主梁施工监控技术要求[J]. 山西建筑, 2007, 33(11): 300-301
作者姓名:王光金
作者单位:贵州高速公路开发总公司,贵州,贵阳,550001
摘    要:介绍了挂篮试验的基本要求和操作要点,从水准点、基点、测量点、测量时间、测量频率等方面阐述了标高观测的要求和监测要点,最后对主桥施工的技术要求进行了论述,以保证桥梁的施工质量。

关 键 词:挂篮试验  线形控制  施工要求  监测要点
文章编号:1009-6825(2007)11-0300-02
修稿时间:2006-12-28

Technical requirements of construction monitoring for main beam in Xiaozhai grand bridge
WANG Guang-jin. Technical requirements of construction monitoring for main beam in Xiaozhai grand bridge[J]. Shanxi Architecture, 2007, 33(11): 300-301
Authors:WANG Guang-jin
Affiliation:WANG Guang-jin
Abstract:This paper introduces the basic requirements and operating essentials of cradle test,illustrates the requirements and monitoring essentials of elevation observation from difficulties,basic point,measuring points,measured time,and measuring frequency,and discusses technical requirements of main bridge construction,in order to ensure construction quality of bridge.
Keywords:cradle test  linear control  construction requirement  monitoring essentials
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号