首页 | 本学科首页   官方微博 | 高级检索  
     


Two- versus three-alternative concurrent-chain schedules: A test of three models.
Authors:Mazur  James E
Abstract:Two experiments with pigeons used concurrent-chain procedures with variable-interval schedules as initial links and different delays to food as terminal links. Two schedules were present in all sessions, but a 3rd schedule was alternately present and absent in successive sessions. When the 3rd schedule delivered food with no terminal-link delay, the presence of this schedule led to an increase in preference for the schedule with the shorter terminal link of the 2 unchanged schedules. When the terminal-link delay for the 3rd schedule was 30 s, the presence of this schedule led to a decrease in preference for the schedule with the shorter terminal link of the 2 unchanged schedules. These results are inconsistent with the predictions of R. Grace's (1994) contextual-choice model, but they are consistent with 2 other mathematical models- delay-reduction theory and the hyperbolic value-added model. (PsycINFO Database Record (c) 2010 APA, all rights reserved)
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号