首页 | 本学科首页   官方微博 | 高级检索  
     


Crane scheduling with time windows in circuit board production lines
Authors:Y. GE  Y. YlH
Affiliation:School of Industrial Engineering, Purdue University , West Lafayette, IN, 47907, USA
Abstract:This paper studies a crane scheduling problem with time windows in a flow-shop type production system. Feasibility of a state of the system is first discussed. Then, based on the insight derived from the mathematical programming formulation of feasibility, an optimization-based heuristic algorithm for real-time scheduling of the system is developed. Computer simulation on randomly generated problems shows that this algorithm has an excellent performance in maximizing throughput without defective jobs.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号