首页 | 本学科首页   官方微博 | 高级检索  
     


Multi-objective two-stage multiprocessor flow shop scheduling – a subgroup particle swarm optimisation approach
Authors:Rong-Hwa Huang  Chun-Ting Hsu
Affiliation:Department of Business Administration, Fu Jen Catholic University, New Taipei City, Taiwan
Abstract:Flow shop production system – compared to other economically important production systems – is popular in real manufacturing environments. This study focuses on the flow shop with multiprocessor scheduling problem (FSMP), and develops an improved particle swarm optimisation heuristic to solve it. Additionally, this study designs an integer programming model to perform effectiveness and robustness testing on the proposed heuristic. Experimental results demonstrate a 10% to 50% improvement in the effectiveness of the proposed heuristic in small-scale problem tests, and a 10% to 40% improvement in the robustness of the heuristic in large-scale problem tests, indicating extremely satisfactory performance.
Keywords:scheduling  flow shop  multiprocessor  particle swarm optimisation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号