首页 | 本学科首页   官方微博 | 高级检索  
     


A practical approach to scheduling a multistage,multiprocessor flow-shop problem
Authors:JON D YANNEY  WAY KUO
Affiliation:1. General Dynamics, Fort Worth Division , Fort Worth, Texas, 76101, USA;2. Department of Industrial Engineering , Iowa State University , Ames, Iowa, 50011, USA
Abstract:This paper describes a rubber manufacturing system and the numerous technological, operating and quality constraints governing its scheduling process. The complex system resembles a flow-shop problem where all jobs share the same general processing order on a progression of machines. The manufacturing system is defined in terms of production stages and parallel processing lines. One stage can process two or more jobs simultaneously. Jobs are often split on the last stage so that two or more parallel processing lines process the same job simultaneously. The scheduling for such a multistage, multiprocessor flow shop is dominated by the quality constraints. A pragmatic approach is provided in which a schedule is constructed through extensive iterations of analysis and simulation.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号