Planning tool requirements for flexible manufacturing: an analytical approach |
| |
Authors: | LUCIO ZAVANELLA ANTONIO BUGlNI |
| |
Affiliation: | Dipartimento di Ingegneria Meccanica , Untversità degli Studi di Brescia, Facoltà di Ingegneria , Via Valotti , Brescia , 9-25060 , Italy |
| |
Abstract: | The problem of tool and fixture resources dimensioning is considered and examined for a productive environment with flexible features. With reference to previous studies, different tool management strategies are pointed out and commented upon; a further control policy based on workpiece batching is suggested and tested. In the second section of the paper, an analytical interpretation of the question in hand is presented and discussed; the effectiveness of the procedure itself is tested by comparing analytical data with results derived from the detailed simulation of a real tool management area. Results are shown in the last section |
| |
Keywords: | |
|
|