首页 | 本学科首页   官方微博 | 高级检索  
     

广州双塔路赤岗涌桥方案设计
引用本文:陈红儒. 广州双塔路赤岗涌桥方案设计[J]. 山西建筑, 2010, 36(18): 340-341
作者姓名:陈红儒
作者单位:中铁第一勘察设计院集团有限公司,陕西,西安,710043
摘    要:联系赤岗涌桥工程概况,结合相关技术标准和桥梁结构设计原则,对三种不同的桥型方案进行了分析比较,探讨了每种方案的优点和缺点,得出钢箱梁方案受力明确、施工周期短、质量易控制、推荐采用的结论。

关 键 词:桥梁  结构设计原则  方案  优点  缺点

Scheme designing of Chigangyong Bridge on Shuangta road in Guangzhou
CHEN Hong-ru. Scheme designing of Chigangyong Bridge on Shuangta road in Guangzhou[J]. Shanxi Architecture, 2010, 36(18): 340-341
Authors:CHEN Hong-ru
Affiliation:CHEN Hong-ru
Abstract:According to the general situation of Chigangyong Bridge project,combining with the related technical standards and the principles of bridge structural design,the thesis analyzed and compared three different kinds of bridge shape scheme,discussed the advantages and disadvantages of each scheme,and made a conclusion that steel-box-beam scheme was recommended to be applied for its specific stress,short constructional period and easy-controlled quality.
Keywords:bridge  the principles of structural design  scheme  advantage  disadvantage
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号