Techno-economic assessment of providing control energy reserves with a biogas plant
Authors:Ervin Saracevic  David Woess  Franz Theuretzbacher  Anton Friedl  Angela Miltner
Affiliation:1. Institute of Chemical, Environmental and Bioscience Engineering, TU Wien, 1060 Vienna, Austria2. University of Natural Resources and Life Sciences, 1180 Vienna, Austria3. University of Applied Sciences, 2700 Wiener Neustadt, Austria
Abstract:
Grid stability is being challenged by the increasing integration of power plants with volatile power generation into the energy system. Power supply fluctuations must be compensated by energy system flexibility. The storability of the energy carrier enables biogas plants to generate power flexibly. In this study, the technical and economic effects of providing positive secondary control energy reserves with an Austrian biogas plant were assessed. The plant’s main focus lies in biomethane production with the option of heat and power generation through combined heat and power (CHP) units. A detailed simulation model of the investigated biogas plant was developed, which is presented in this work. Ex-post simulations of one year of flexible plant operation were conducted with this model. The findings show that the installed biogas storage capacity is sufficient to provide control energy reserves while simultaneously producing biomethane. Profitability of providing control energy reserves largely depends on the prices at the control energy market and on CHP unit start-up costs. A cost efficiency analysis demonstrated that investing in a hot water tank with a volume of 5 m3 for short-term heat storage turned out to be economically viable.
Keywords:biogas plant  process simulation  control energy reserves  economic assessment  gas storage  
本文献已被 SpringerLink 等数据库收录!
点击此处可从《Frontiers of Chemical Science and Engineering》浏览原始摘要信息