首页 | 本学科首页   官方微博 | 高级检索  
     

水泥粉煤灰碎石桩复合地基加固设计及施工
引用本文:张瑾.水泥粉煤灰碎石桩复合地基加固设计及施工[J].山西建筑,2004,30(19):56-57.
作者姓名:张瑾
作者单位:太原市市政工程总公司
摘    要:介绍了水泥粉煤灰碎石桩复合地基的加固原理、特点及适用范围,对其构造要求、使用机具设备、材料要求、配合比设计等进行了简单介绍,并提出了CFG桩在施工过程中的主要施工方法及质量控制要求。

关 键 词:碎石桩(CFG桩)  混合料  振动沉管  充盈系数
文章编号:1009-6825(2004)19-0056-02
修稿时间:2004年6月15日

Stabilizing design and construction of cement coal ash CFG pile in compound foundation
ZHANG Jin.Stabilizing design and construction of cement coal ash CFG pile in compound foundation[J].Shanxi Architecture,2004,30(19):56-57.
Authors:ZHANG Jin
Abstract:It introduces the stabilizing mechanism,characteristics and applicative range of cement coal ash CFG pile in compound foundation as well as structural requirements,used instrumental equipment,material requirements and cooperative ratio design are briefly introduced.It also propounds the main constructive methods and quality control requirements of CFG pile in constructive process.
Keywords:CFG pile  mixed material  shaking seeking-pile  plentiful coefficient
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号