某工程高强预应力管桩沉桩竖向裂缝原因分析及处理
引用本文:高玉斌,万志勇. 某工程高强预应力管桩沉桩竖向裂缝原因分析及处理[J]. 广东土木与建筑, 2013, 0(1): 25-27
作者姓名:高玉斌  万志勇
作者单位:广州市设计院
摘    要:某项目高强预应力管桩沉桩施工中遇到强风化泥岩中存在中风化夹层的情况,采用引孔打桩法沉桩但出现竖向裂缝,文中对该问题进行分析并采取相应的技术措施,同时也发现生产中存在的质量问题。

关 键 词:高强混凝土预应力管桩  沉桩  裂缝

Analysis and Treatment of the Verticle Cracks on PHC Pipe-piles during Pile Driving in the Engineering
Gao Yubin Wan Zhiyong. Analysis and Treatment of the Verticle Cracks on PHC Pipe-piles during Pile Driving in the Engineering[J]. Guangdong Architecture Civil Engineering, 2013, 0(1): 25-27
Authors:Gao Yubin Wan Zhiyong
Affiliation:Gao Yubin Wan Zhiyong(Guangzhou Design Institute Guangzhou 510620,China)
Abstract:The method of guilding-hole piling was taken in pile driving in the project.The causes of verticle cracks on PHC tube-piles in strongly-weathered mudstone with moderately-weathered mudstone layers are analyzed in this paper.Accordingly,the technical measures to solve the problem are taken.Simultaneously,the quality problems are found in production.
Keywords:high-prestressed-concrete pipe-pile  pile driving  cracks