钢管柱、贝雷梁与满堂脚手架支撑体系在拱式渡槽施工中的应用
引用本文:林伟明,田燕龙,邵鹏展,赵云龙.钢管柱、贝雷梁与满堂脚手架支撑体系在拱式渡槽施工中的应用[J].四川水力发电,2019(4):84-87.
作者姓名:林伟明  田燕龙  邵鹏展  赵云龙
作者单位:中国水利水电第十工程局有限公司
摘    要:通常情况下,拱式渡槽肋拱施工常采用满堂脚手架支撑体系,但满堂脚手架支撑体系存在准备工作时间较长、工程量大、投资大等问题。龙门垭拱式渡槽肋拱采用钢管柱+贝雷梁+满堂脚手架支撑体系,顺利完成了肋拱合拢,该方法既节约成本,提高施工效率,又能满足设计及施工质量要求。

关 键 词:龙门垭拱式渡槽  钢管柱  贝雷梁  满堂脚手架

Application of Steel Pipe Post,Bailey Beam and Full Scaffolding Supporting System in Arch Aqueduct Construction
LIN Weiming,TIAN Yanlong,SHAO Pengzhan,ZHAO Yunlong.Application of Steel Pipe Post,Bailey Beam and Full Scaffolding Supporting System in Arch Aqueduct Construction[J].Sichuan Water Power,2019(4):84-87.
Authors:LIN Weiming  TIAN Yanlong  SHAO Pengzhan  ZHAO Yunlong
Affiliation:(Sinohydro Bureau 10 Co., LTD, Chengdu, Sichuan, 610072)
Abstract:Usually, full scaffolding supporting system is often used in arch aqueduct rib arch construction;however, there are many problems in full scaffolding support system, such as long preparation time, large amount quantity of construction, large investment and so on. Longmenya arch aqueduct rib arch adopts steel pipe post+bailey beam+full scaffolding supporting system, and achieves successful closure of rib arch. This method not only saves the cost and improves construction efficiency, but also meets the requirements of design and construction quality.
Keywords:Longmenya arch aqueduct  steel pipe post  bailey beam  full scaffolding