首页 | 本学科首页   官方微博 | 高级检索  
     

排桩冻结法深基坑排桩监测水平位移校正模型
引用本文:袁宝远,王江,朱文白,吕建红,任丽芳. 排桩冻结法深基坑排桩监测水平位移校正模型[J]. 水利水电科技进展, 2006, 26(6): 58-61
作者姓名:袁宝远  王江  朱文白  吕建红  任丽芳
作者单位:河海大学土木工程学院,江苏,南京,210098;江苏省长江公路大桥建设指挥部,江苏,镇江,212000
基金项目:国家自然科学基金委员会、二滩水电开发有限责任公司雅砻江水电开发联合研究基金
摘    要:对润扬大桥南锚碇排桩冻结法深基坑,通过孔内测斜对排桩水平位移进行监测,监测过程中发现由于冻结和孔底端部位移造成排桩测斜数据有较大误差,必须建立有效的位移校正方法对排桩测斜数据进行校正。数据分析表明,通过压顶梁水平位移不能校正排桩水平位移测斜数据误差,而利用支撑位置位移校正排桩测斜水平位移误差是可行的。通过第一道支撑位置支撑轴力和温度参数对排桩水平位移进行校正,得到排桩水平位移校正模型。利用已有的监测数据,对排桩水平位移校正模型从两方面进行了验证,结果表明,校正模型的建立为基坑反演分析和基坑稳定性预测预报提供了较准确的排桩水平位移监测数据。

关 键 词:润扬大桥  排桩冻结法  基坑监测  水平位移  校正模型
文章编号:1006-7647(2006)06-0058-04
修稿时间:2005-11-07

Rectification model for horizontal displacement monitoring of piles to support deep foundation pits with frozen ground
YAUN Bao-yuan,WANG Jiang,ZHU Wen-bai,L Jian-hong,REN Li-fang. Rectification model for horizontal displacement monitoring of piles to support deep foundation pits with frozen ground[J]. Advances in Science and Technology of Water Resources, 2006, 26(6): 58-61
Authors:YAUN Bao-yuan  WANG Jiang  ZHU Wen-bai  L Jian-hong  REN Li-fang
Abstract:The pile-supported deep foundation pits with frozen soil were adopted at south anchorage of Runyang Bridge,and the horizontal displacement of piles was monitored by in-hole inclinometers.Owing to the fact that the soil freezing and the displacement at the bottom of the holes result in large error in measured data,it is necessary to develop an effective method to rectify the measured data from inclinometers.Numerical analysis shows that the displacement of the support position can be used for rectification of the measured data.Based on rectification of the measured data of horizontal displacement of piles with the support axial force at the first support position and temperature parameter,a horizontal displacement rectification model for piles is obtained,and the model is verified with the data having been obtained.The present model provides accurate monitoring data of horizontal displacement of piles for back analysis and prediction of stability of foundation pits.
Keywords:Runyang Bridge  method of ground freezing and pile-support  foundation pit monitoring  horizontal displacement  rectification model
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《水利水电科技进展》浏览原始摘要信息
点击此处可从《水利水电科技进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号