首页 | 本学科首页   官方微博 | 高级检索  
     

下坂地水利工程沥青混凝土心墙坝工作性态分析
引用本文:戴灿伟.下坂地水利工程沥青混凝土心墙坝工作性态分析[J].浙江水利水电专科学校学报,2013(2):1-5.
作者姓名:戴灿伟
作者单位:新疆水利水电科学研究院,新疆乌鲁木齐830049
摘    要:以新疆下坂地水利枢纽工程中沥青混凝土心墙坝的设计、施工及监测成果为例,对施工期沥青混凝土心墙变形和温度安全监测资料进行了分析,并对下游坝体内部变形的安全监测资料也进行了较详细的分析探讨.结果表明下坂地水利枢纽工程沥青混凝土心墙砂砾石堆石坝的工程质量及结构的稳定安全可靠.此结果可为相关工程提供借鉴.

关 键 词:下坂地水利工程  沥青混凝土心墙  安全监测  温度  变形

Working Status Analysis on Asphalt Concrete Core Dam in Water Conservancy Engineering
Affiliation:DAI San-wei (Xijiang Science Academy of Water Conservancy and Hydropower, Urumchi 830049, China)
Abstract:The deformation of asphalt concrete core wall under construction and the data of temperature safety monitoring are analyzed, taking the design, construction and monitoring of asphalt concrete core dam in Xiabandi water conservancy hub project, Xijiang, for example. The dam safety monitoring data of internal deformation in downstream is also analyzed in detail. Results show that the construction quality and the structure safety of the sandy gravel asphalt concrete core wall in Xiabandi water conservancy hub project is stable and reliable, which can provide reference for related projects.
Keywords:Xiabandi water conservancy engineering  asphalt concrete core wall  safety monitoring  temperature  deformation
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号