首页 | 本学科首页   官方微博 | 高级检索  
     

水电站施工测量数据动态管理系统研究
引用本文:李小龙,张天昊,程涛,徐军,王迪. 水电站施工测量数据动态管理系统研究[J]. 人民长江, 2017, 48(16): 63-66. DOI: 10.16232/j.cnki.1001-4179.2017.16.014
作者姓名:李小龙  张天昊  程涛  徐军  王迪
作者单位:1. 东华理工大学 江西省数字国土重点实验室,江西 南昌 330013;流域生态与地理环境监测国家测绘地理信息局重点实验室,江西 南昌 330013;2. 东华理工大学 江西省数字国土重点实验室,江西 南昌,330013;3. 广西科技大学 汽车与交通学院,广西 柳州,545006;4. 武汉大学 测绘遥感信息工程国家重点实验室,湖北 武汉,430079
摘    要:针对传统的水电站施工测量数据数字化管理水平不高,利用不够深入等问题,设计了新的水电站施工测量数据动态管理系统,简化数据处理过程,动态构建三维模型,真实可靠地描述工程进度与质量。系统分为两部分:单机版的数据规范化处理子系统和WEB版的施工测量数据管理子系统。详细介绍了各子系统的功能设计,包括数据规范化处理、成果文件输出、测量数据入库、数据动态建模分析与可视化等。以西部某水电站为例,对该系统的科学性和可行性进行了验证,证明运用该系统可加强施工测量数据管理,充分挖掘数据中的有用信息,提高工程监管水平。

关 键 词:施工测量数据   规范化处理   动态管理   三维建模   进度分析  

Research on dynamic management system for construction survey data of hydropower station
LI Xiaolong,ZHANG Tianhao,CHENG Tao,XU Jun,WANG Di. Research on dynamic management system for construction survey data of hydropower station[J]. Yangtze River, 2017, 48(16): 63-66. DOI: 10.16232/j.cnki.1001-4179.2017.16.014
Authors:LI Xiaolong  ZHANG Tianhao  CHENG Tao  XU Jun  WANG Di
Abstract:Aiming at low digitalization management level of traditional construction survey data for hydropower station and underutilization, a new dynamic management system of construction survey data is designed and in the system, the data processing is simplified and the construction progress and quality can be described using 3D modeling. The system consists of two parts: a stand-alone processing subsystem of data standardization and web-version of data management subsystem in construction surveying. Functional designs of the subsystems are introduced in detail, including data standardization process, results output, survey data input, data dynamic modeling, analyzing and visualization etc. Finally, taking a hydropower station in western China as an example, the entire system was developed and realized, and the scientificity and feasibility of its design were also verified. The system can help enhance the management of construction surveying data, fully explore the useful information, and improve the level of project supervision.
Keywords:construction surveying data  data management standardization  dynamic management  3D modeling  progress analysis  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号