BIM技术在大型游乐项目中的管理及应用
引用本文:田厚仓, 郜雨, 刘冲亚, 陈宇, 张顺利, 闫丽璐, 崔瑞康, 王灵. BIM技术在大型游乐项目中的管理及应用[J]. 土木建筑工程信息技术,2020, 12(3): 97-103.doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.15
作者姓名:田厚仓  郜雨  刘冲亚  陈宇  张顺利  闫丽璐  崔瑞康  王灵
作者单位:中国建筑第八工程局有限公司, 上海 200135
摘    要:当代社会随着文旅产业的兴起,常规的建造手段已无法满足新时代游艺设备的使用需求,通过引入BIM技术进行模拟施工,提前了解项目的重难点,做好应对措施。本项目存在诸多专业交叉与协调的工作,通过BIM模拟施工,合理地解决现场难点问题、碰撞问题,深化设计,以及通过建立BIM三维结构模型,利用结构模型的直观性,来划分施工关键区域与非关键区域,进行工序倒置,成功解决了施工顺序固定,关键线路难以压缩、加快工期而又不无限增加成本的难题,有效地提高了施工的效益。

关 键 词:BIM   工序倒置   快速建造   深化设计

Application of BIM Technology in Managing Large-Scale Amusement Project
Tian Houcang,Gao Yu,Liu Chongya,Chen Yu,Zhang Shunli,Yan Lilu,Cui Ruikang,Wang Ling. Application of BIM Technology in Managing Large-Scale Amusement Project[J]. Journal of Information Technology in Civil Engineering and Architecture, 2020, 12(3): 97-103. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.03.15
Authors:Tian Houcang  Gao Yu  Liu Chongya  Chen Yu  Zhang Shunli  Yan Lilu  Cui Ruikang  Wang Ling
Affiliation:China Construction Eighth Engineering Division Co., Ltd., Shanghai 200122, China
Abstract:The culture and tourism industry is now in high-speed development, and the conventional construction methods is no longer able to meet the requirements of the latest entertainment equipments. The introduction of BIM technology is able to simulate construction progress in advance, thus identifying the key points and difficulties of the project and preparing corresponding measures before the construction. The project introduced in this paper involves a lot of cross-disciplinary and coordination work, and the construction simulation using BIM has reasonably solved the difficulties and collision problems on site, as well as the design development issue. By establishing a 3D BIM structure model, the intuitiveness of the model contributes to instant and clear division of critical area and non-critical area. Through process inversion, the construction sequence is confirmed, and the problems of difficulties in compressing key lines, and in compressing construction period without unlimited cost increase have been both successfully solved. The beneficial results of construction have been significantly improved.
Keywords:BIM   Process Inversion   Rapid Construction   Design Development