首页 | 本学科首页   官方微博 | 高级检索  
     


Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules
Authors:Ihsan Sabuncuoglu and Don L Hommertzheim
Affiliation:(1) Department of Industrial Engineering, Bilkent University, 06533 Ankara, Turkey;(2) Department of Industrial Engineering, Wichita State University, 67208 Wichita, KS, USA
Abstract:Although extensive research has been conducted to solve design and operational problems of automated manufacturing systems, many of the problems still remain unsolved. This article investigates the scheduling problems of flexible manufacturing systems (FMSs). Specifically, the relative performances of machine and automated guided vehicle (AGV) scheduling rules are analyzed against various due-date criteria. First, the relevant literature is briefly reviewed, and then the rules are tested under different experimental conditions by using a simulation model of an FMS. The sensitivity to AGV workload, buffer capacity, and processing-time distribution is also investigated to assess the robustness of the scheduling rules.
Keywords:flexible manufacturing systems  automated guided vehicles  scheduling  dispatching  simulation
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号