首页 | 本学科首页   官方微博 | 高级检索  
     

三峡三期RCC围堰拆除方案与设计关键技术研究
引用本文:陈敦科,向文飞. 三峡三期RCC围堰拆除方案与设计关键技术研究[J]. 中国水利, 2007, 0(21): 53-54,52
作者姓名:陈敦科  向文飞
作者单位:长江水利委员会长江勘测规划设计研究院,430010,武汉
摘    要:本文介绍了三峡三期RCC围堰爆破拆除方案。该方案通过对设计中遇到的围堰倾倒可靠性、深水爆破装药量确定等技术难题进行了分析与研究,提出了相应解决方法和处理措施,确保了三峡三期RCC围堰拆除爆破的成功。

关 键 词:三峡  RCC围堰  拆除方案  爆破
文章编号:1000-1123(2007)21-0053-02
修稿时间:2007-09-26

Key technologies and design for RCC cofferdam removal of Three Gorge Reservoir
Chen Dunke,Xiang Wenfei. Key technologies and design for RCC cofferdam removal of Three Gorge Reservoir[J]. China Water Resources, 2007, 0(21): 53-54,52
Authors:Chen Dunke  Xiang Wenfei
Abstract:The removal plan of RCC cofferdam of the Three Gorges Reservoir is introduced. Key technologies such as dumping reliability of cofferdam and deciding blast loading in deep water are investigated and related measures are put forward, which ensure the success of removal of RCC cofferdam of the Three Gorges Reservoir.
Keywords:Three Gorges   RCC cofferdam   removal plan   blasting
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号