600 MW超临界锅炉末级过热器失效原因探析
引用本文:黄伟,匡国强,李友庆,孔鹏程,钟建明.600 MW超临界锅炉末级过热器失效原因探析[J].电力设备,2007,8(8):77-79.
作者姓名:黄伟  匡国强  李友庆  孔鹏程  钟建明
作者单位:1. 湖南省电力试验研究院,湖南省,长沙市,410007
2. 湖南华电长沙发电有限责任公司,湖南省,长沙市,410203
3. 大唐湘潭发电有限责任公司,湖南省,湘潭市,411102
4. 湖南华电石门发电有限责任公司,湖南省,石门市,415300
5. 湖南省火电建设公司,湖南省,株洲市,412000
摘    要:某电厂3号超临界锅炉投产后运行不到500 h便发生4次末级过热器爆漏事故,其部位多发生在外数第2、3、4、20内圈管,特征为管屏下部内弯头横向裂纹.过热器爆漏的主要原因为末级过热器SA-213TP347在弯管后未经固溶处理,致使末级过热器内弯处管材存在晶间腐蚀和硬度超标;同时末级过热器由于其管系设计布置不合理,运行中与烟气紊流发生共振,致使末级过热器内弯头在极短的时间内快速疲劳失效.通过采用增加末级过热器固定管夹,改变其固有频率,将末级过热器下部弯头更换为经固溶处理的弯管等措施后,锅炉再未发生类似的失效损坏.

关 键 词:超临界锅炉  末级过热器  失效分析  措施
修稿时间:2007年4月10日

Analysis of Final Stage Superheater Failure of 600 MW Supercritical Pressure Boiler
HUANG Wei,KUANG Guo-qiang,LI You-qing,KONG Peng-Cheng,ZHONG Jian-ming.Analysis of Final Stage Superheater Failure of 600 MW Supercritical Pressure Boiler[J].Electrical Equipment,2007,8(8):77-79.
Authors:HUANG Wei  KUANG Guo-qiang  LI You-qing  KONG Peng-Cheng  ZHONG Jian-ming
Affiliation:1. Hunan Electric Power Test and Research Institute, Changsha 410007, China; 2. Hunan Huadian Changsha Power Generation Co.Ltd., Changsha 410203, China; 3. Datang Xiangtan Power Generation Co.Ltd, Xiangtan 411102, China; 4. Hunan Hnadian Shimen Power Generation Co.Ltd, Shimen 415300, China; 5.Hunan Thermal Power Construction Company, Zhuzhou 412000, China
Abstract:After No.3 supercritical boiler in a certain power plant operated for less than 500 h since its commissioning,bursting and leakage failures occurred four times in the final stage superheater; The bursts mostly were located on the inner tracks of tubes rank 2,3,4and 20 from outside,featuring transvers cracks on the internal elbows of tube platen's underpart. According to the analysis,the main causes of superheater bursting and leakage were,solution treatment were not carried out after tube bending,and the design of tube ararngement was inappropriate,resulting in the intercrystalline corrosion and hardness beyond standard in the material of inner elbows,and the resonance with flue gas twrbulence,leading to fatigue failure of inner elbows rapidly. By adding tube fixing clamps on the final stage superheater to change its natural frequency and by changing the underpart elbows to those having undergone solution treatment,such bursts never occur up to now.
Keywords:supercritical pressure boiler  final stage superheater  invalidation analysis  measures