首页 | 本学科首页   官方微博 | 高级检索  
     

轻轨房山线跨永定河中堤工程模型试验研究
引用本文:张胜,窦宝松,鲍维猛,陈秀军.轻轨房山线跨永定河中堤工程模型试验研究[J].北京水务,2011(5):29-31.
作者姓名:张胜  窦宝松  鲍维猛  陈秀军
作者单位:1. 北京工业大学建工学院,100124
2. 北京市水利科学研究所,100048
摘    要:北京市轨道交通房山线稻田站—世界公园站区间跨越永定河和稻田水库,永定河中堤为砂砾石均质堤,为了防治液化进行模型试验,为工程提供依据。

关 键 词:轻轨房山线  液化  模型试验

The model test of Light Railway Fanshan Line project acrossing the Yongding river dike
ZHANG Sheng DOU Bao-song BAO Wei-meng CHEN Xiu-jun.The model test of Light Railway Fanshan Line project acrossing the Yongding river dike[J].Beijing Water,2011(5):29-31.
Authors:ZHANG Sheng DOU Bao-song BAO Wei-meng CHEN Xiu-jun
Affiliation:ZHANG Sheng1 DOU Bao-song2 BAO Wei-meng2 CHEN Xiu-jun2(1.The College of Architecture and Civil Engineering,Beijing University of Technology,Beijing,100124,China,2.Beijing Hydraulic Research Institute,100048,China)
Abstract:In Beijing Light Railway Fangshan Line of the Daotian Station to the world's Park Station across the Yongding River and Daotian Reservoir,the embankment of Yongding River is a homogeneous sand and gravel dike,the model test for the control Liquefaction is maken to provide the basis for the project.
Keywords:Beijing Light Railway Fangshan Line control Liquefaction the model test  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号