首页 | 本学科首页   官方微博 | 高级检索  
     

软土深基坑单井回灌参数优化与现场测试分析
引用本文:李又云,王欢,苏世强,李昊阳. 软土深基坑单井回灌参数优化与现场测试分析[J]. 地下空间与工程学报, 2021, 17(2): 520-528
作者姓名:李又云  王欢  苏世强  李昊阳
作者单位:长安大学特殊地区公路工程教育部重点实验室,西安710064
摘    要:为解决因深基坑降水和基坑渗漏引起的地表沉降问题,通常在坑外进行地下水回灌,而回灌参数会影响地表沉降控制效果.为了选取合适的回灌参数,采用ABAQUS有限元程序进行滤管长度、回灌井井径、井深、回灌压力对地表沉降影响的敏感性分析,得到如下结论:回灌压力和回灌井井深为控制地表沉降的关键因素,对控制基坑周边的沉降变形相对敏感,...

关 键 词:软土基坑  基坑回灌  三维有限元分析  回灌效率
收稿时间:2020-08-06

Parameters Optimization and Field Test Analysis on Recharge Well in Deep Foundation Pit of Soft Soil
Li Youyun,Wang Huan,Su Shiqiang,Li Haoyang. Parameters Optimization and Field Test Analysis on Recharge Well in Deep Foundation Pit of Soft Soil[J]. Chinese Journal of Underground Space and Engineering, 2021, 17(2): 520-528
Authors:Li Youyun  Wang Huan  Su Shiqiang  Li Haoyang
Abstract:In order to solve the problem of surface subsidence caused by dewatering and seepage of deep foundation pit, the method of the groundwater recharge is usually carried out outside the pit, and the parameters of recharge will affect the effect of surface subsidence control. In order to select suitable recharge parameters, ABAQUS finite element program was used to analyze the influence of filter tube length, recharge well diameter, well depth, and the recharge pressure on surface subsidence. The following conclusions are drawn: the recharge pressure and the recharge well depth are the key factors to control surface subsidence, and they are relatively sensitive to control settlement and deformation around foundation pit. These two factors should be considered first in designing recharge wells. The length of filter tube and the diameter of recharge wells are not sensitive to controlling surface subsidence and deformation. The greater the recharge pressure, the better the effect of controlling surface subsidence, but the recharge pressure can not be increased indefinitely. The upper limit of recharge pressure should be calculated according to the sealing strength around the recharge well. The deeper the recharge well is, the smaller the surface settlement around the foundation pit is, but the reasonable depth should be selected according to the geological conditions. The selected parameters of recharge were used in the field recharge test. After recharge, the groundwater level outside the pit rose obviously, which effectively controled the ground settlement around the pit.
Keywords:soft soil foundation pit  foundation pit recharge  three-dimensional finite element analysis  recharge efficiency  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号