首页 | 本学科首页   官方微博 | 高级检索  
     

新建地铁车站下穿既有车站土建措施研究
引用本文:何海健,李松梅,童利红,杜玉峰,王伟锋.新建地铁车站下穿既有车站土建措施研究[J].地下空间与工程学报,2021,17(1):273-281.
作者姓名:何海健  李松梅  童利红  杜玉峰  王伟锋
作者单位:北京市轨道交通设计研究院有限公司,北京100068;北京市轨道交通工程技术研究中心,北京100068
摘    要:轨道交通网络化发展导致线路之间的交叉穿越日益增多,地铁新建车站下穿既有车站土建技术尚无统一认识.在国内工程案例分析的基础上,系统归纳了现有穿越技术措施,并以国内目前穿越规模最大的北京地铁6号线苹果园站下穿1号线苹果园站工程为例,介绍了各类土建技术措施在该工程中的应用.研究表明:(1)可从既有车站沉降的影响来源、传播路径...

关 键 词:地铁车站  下穿  既有车站  土建措施
收稿时间:2020-06-21

Research on Construction Technical Measures of a New Metro Station Passing underneath an Existing One
He Haijian,Li Songmei,Tong Lihong,Du Yufeng,Wang Weifeng.Research on Construction Technical Measures of a New Metro Station Passing underneath an Existing One[J].Chinese Journal of Underground Space and Engineering,2021,17(1):273-281.
Authors:He Haijian  Li Songmei  Tong Lihong  Du Yufeng  Wang Weifeng
Abstract:Development of rail transport network has caused an increasing number of crossing points between metro lines. However, no united knowledge has yet been formed on the construction technology of new built station passing underneath an existing one. Based on analysis of the domestic project cases, existing crossing technological measures were summarized systematically, next, an example which is the greatest scale of crossing in domestic-Pingguoyuan Metro Station of Beijing Metro Line 6 passing underneath another of Beijing Metro Line 1 was taken for, and various construction technological measures being applied in this project are introduced. Results indicate that: (1) conventional adopted technological measures can be summarized from three aspects, such as settlement influence sources of existing metro station, travel path and object of protection. (2) aimed at super-large scale metro station passing underneath an existing one, innovatively adopted technology of screw and beam supporting accompanied by high pressure concrete supplement played a key role in controlling post settlement of existing metro station after formation of beam-column system of PBA method. (3) the selection of construction method, advancing consolidation, excavation span, construction sequence and other measures should be based on the analysis of the mechanism of settlement in each construction stage, and the comprehensive measures should be taken. Research of this paper may provide references for similar crossing projects.
Keywords:metro station  pass underneath  existing metro station  construction measures  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号