高寒区某拱坝首蓄期坝体渗透压力异常现象分析
引用本文:韩世栋,李新. 高寒区某拱坝首蓄期坝体渗透压力异常现象分析[J]. 西北水电, 2021, 0(1): 60-64
作者姓名:韩世栋  李新
作者单位:1.南瑞集团(国网电力科学研究院)有限公司;2.新疆额尔齐斯河流域开发工程建设管理局
摘    要:文章基于北疆高寒地区百米级某拱坝坝体渗压计监测资料,分析坝体渗透压力异常现象的原因,分析认为施工期温度控制措施是关键因素,可为高寒地区建设同类型拱坝提供参考.

关 键 词:高寒区  拱坝  首蓄期  渗透压力

Analysis on Anomalies of the Dam Osmotic Pressure of an Arch Dam during the Initial Storage Period in Alpine Region
HAN Shidong,LI Xin. Analysis on Anomalies of the Dam Osmotic Pressure of an Arch Dam during the Initial Storage Period in Alpine Region[J]. Northwest Water Power, 2021, 0(1): 60-64
Authors:HAN Shidong  LI Xin
Affiliation:(Nari Group (State Grid Electric Power Research Institute) Co., Ltd., Nanjing 211000,China;Xinjiang Administrative Bureau of Construction of Irtysh River Basin Development Project, Urumqi 830000,China)
Abstract:Based on the piezometer monitoring data of a hundred-meter arch dam in northern Xinjiang,the article analyzes the causes of the abnormal osmotic pressure of the dam.The analysis indicates that temperature control measures during the construction period are the key factor,and the article provides reference for the construction of similar arch dams in alpine region.
Keywords:alpine region  arch dam  initial storage period  osmotic pressure